Introducción
Capítulo A.3
Edición: Matías Irarrázaval & Andres Martin
Traductores: Fernanda Prieto-Tagle & María José Martínez
Lignes directrices.
Collection Avis et Rapports.
Otros trastornos
Capítulo H.4
Editores: Laura Borredá Belda, Matías Irarrázaval & Andres Martin
Traductores: Sara Diego Castaño, Laura Álvarez Bravos, Rebeca Santonja & Beatriz Ortega
Ginebra, 14-16 de marzo de 2011
Otros trastornos
Capítulo H.5.1
Edición: Matías Irarrázaval & Andres Martin
Traductores: Fernanda Prieto-Tagle & Iván Olle Llopis
TROUBLES DU DÉVELOPPEMENT
Chapitre C.3
Edition en français Traduction : Alice Guédon Sous la direction de : David Cohen Avec le soutien de la SFPEADA
Troubles Anxieux
Chapitre F.3
Edition en français
Traduction : Alexis Revet
Sous la direction de : Jean-Philippe Raynaud Avec le soutien de la SFPEADA
Autres troubles
Chapitre H.1
Edition en français
Traduction : Priscille Gérardin et Malaïka Lasfar Sous la direction de : Priscille Gérardin Avec le soutien de la SFPEADA
Normes des Soins Infirmiers, Gynecologiques, Obstétricaux et Néonataux
Accès au site Décembre 2019
This Case Study explores flood forecasting systems from the perspective of its position within the flood warning process. A method for classifying the different approaches taken in flood forecasting is introduced before the elements of a present-day flood forecasting system are discussed in detail. ...Finally, the state of the art in developing flood forecasting systems is addressed including how to deal with specific challenges posed.
The target group of this case study are decision makers in disaster risk management and/or water management. The case study should help to understand some hydrologic basics of the flood forecast and assist in the administration and implementation of an appropriate flood warning system in a specific environment, to find the best solution for a region.
Best solutions depend mainly on quality and availability of data, the areas and/or points of interest, catchment properties, cross border catchments, and financial capabilities with special consideration of flood forecast.
more